22.5° | 22.5° | 30° | 30° | |
OFFSET | DISTANCE BETWEEN BENDS | SHRINK | DISTANCE BETWEEN BENDS | SHRINK |
2" | 5-1/4" | 3/8" | ||
3" | 7-3/4" | 9/16" | 6" | 3/4" |
4" | 10-1/2" | 3/4" | 8" | 1" |
5" | 13" | 15/16" | 10" | 1-1/4" |
6" | 15-1/2" | 1-1/8" | 12" | 1-1/2" |
7" | 18-1/4" | 1-5/16" | 14" | 1-3/4" |
8" | 20-3/4" | 1-1/2" | 16" | 2" |
9" | 23-1/2" | 1-3/4" | 18" | 2-1/4" |
10" | 26" | 1-7/8" | 20" | 2-1/2" |
45° | 45° | 60° | 60° | |
OFFSET | DISTANCE BETWEEN BENDS | SHRINK | DISTANCE BETWEEN BENDS | SHRINK |
2" | ||||
3" | ||||
4" | ||||
5" | 7" | 1-7/8" | ||
6" | 8-1/2" | 2-1/4" | 7-1-4" | 3" |
7" | 9-3/4" | 2-5/8" | 8-3/8" | 3-1/2" |
8" | 11-1/4" | 3" | 9-5/8" | 4" |
9" | 12-1/2" | 3-3/8" | 10-7/8" | 4-1/2" |
10" | 14" | 3-3/4" | 12" | 5" |
The #1 website for NICET Practice Tests, NICET study guides, Fire Alarm Code Knowledge, and General Fire Alarm Topics. We have up to date information on the newest fire alarm trends such as fire service access elevators, mass notification, voice intelligibility, occupant evacuation elevators and two-way communication for Areas of Refuge. Topics also include fire alarm system programming and technical tips. Learn how to build the best ground fault meter with step by step instructions.
Thursday, February 27, 2014
Conduit Bender Offset Reference Table
This is a chart to help you better understand the the shrink amount and the distance between conduit bends when performing a saddle with EMT, Rigid electrical conduit or any other type of electrical conduit. You will want to use the arrow mark on the conduit bender and refer to the degree markers along the side of the conduit bender head. Make sure the electrical conduit is always in line with the pipe bender to insure nice straight bends.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment